P. P. Patel & Co., Solapur

Customer:
P P Patel and Co.
Location:
Solapur
Total Plant Capacity:
256 kWp
Annual Power Generated:
3.8 lakh units
Annual GHG Emissions Reduced:
300 Tons

Details:

P. P. Patel & Co. is a powder metallurgy factory. The ground-mounted solar plant is installed in the factory premises at Solapur.

  • The solar power plant was installed in 2 phases. In the first phase, 100 kWp plant was installed and the remaining was installed in the next phase.
  • The plant is installed in the factory premises and the power generated is fed directly into the LT panel of the factory
  • The plant is installed under the ‘Net Metering’ scheme of MSEDCL. Excess power generated is fed back to the grid. The factory claims a set off of the units fed into the grid, thus saving a large amount of cost on power consumption
  • The entire system is monitored online. Sunshot’s proprietary system ensures that the data acquired from inverters and weather station is stored in a cloud network, and is monitored by the client to evaluate various performance parameters. It is also used for conducting preventive maintenance activities